Product Advantages
• Excellent performance
The efficient exhaust gas turbocharger ensures more thorough intake, improves engine efficiency, and utilizes pressure pulse exhaust pipes to fully utilize waste energy, further improving combustion, increasing engine low load efficiency, and reducing engine specific fuel consumption.
High torque, strong power, fast transient response, and high torque reserve.
•High reliability
advanced PT fuel system features unique overspeed protection, low-pressure fuel supply, few pipelines, and low failure rate.
Originating from excellent overall design, it has excellent reliability.
•Good durability
The cylinder block and cylinder head adopt high-strength integrated design, which reduces the failure rate, is durable, and has excellent reputation.
•Variable speed constant pressure
Adopting variable speed water supply, in conjunction with the American FM 13333.11 Variable Speed Pressure Limiting Control (VSPLC) system.
Multiple devices can start parallel water supply simultaneously, quickly extinguishing the fire within seconds;
•Convenient maintenance
Overall modular design, block integration, compact structure, detachable parts, high reusability.
Same platform design, high universality of parts.
•Strong adaptability
Oil products have a wide range of adaptability and strong environmental adaptability.
K50 |
|
type |
V-shaped/16 cylinder/four stroke/four valve |
displacement |
50L |
Air Intake method |
Boosting intercooling |
maximum power |
2220HP(1657kw) |
fuel system |
PT fuel system |
For Delivery
Question 1:How to buy engine spare parts? First of all, please tell us the part number of the parts you need. We will supply the same parts as yours. Secondly, if you don't know the part number, please provide parts name and engine series number, then we will check the part number through engine series number.
Question 2:How long is the delivery time? For complete engine and Power units , we need to arrange production according to the order, our general delivery time is 15-30 days. For spare parts , our general delivery time is 3-10 days.
Question 3:How to arrange delivery? Considering the large volume and weight of our products, to save the shipping cost, we generally recommend ship to your nearest port For small items and urgent orders, we can also provide air shipment and send goods to the airport in your city or your company address.
Question 4:How about Payment Methods? We suggest 30/70,T/T payment method: 30 percent down payment on placement of the order, with the remaining 70% due upon shipment. Question 5:How about Packing Methods? Normally we use wooden boxes for packaging or we can pack it according to your special needs.